Biomass boiler installation case studies

We've completed a range of new biomass boiler installation projects across Great Britain ranging from small scale commercial boilers to large scale industrial boilers. Many of these projects are full turn-key installations, with BBSM Ltd completing the design and specification and then implementing the whole project to completion. On this page, you'll find some examples of recent projects in England, Wales and Scotland. We have also offered contract installation on behalf of a number of developers. Please give us a call to discuss your requirements.

Large hotel

Location
Wales
Boiler power
2 x 60kW
Boiler Make
Hargassner
Installation type
Turn-key

Two 60kW Hargassner wood pellet boilers were installed to provide heat and hot water for a large hotel in Wales.

Kitchen & bathroom door manufacturer

Location
Northern England
Boiler power
2.1MW
Boiler Make
Mawera
Installation type
Contract

BBSM Ltd provided an engineering team to the developer to complete the installation and assembly of a 2.1MW biomass boiler system operating on wood residue from the company’s manufacturing process.

Business unit complex

Location
Southern England
Boiler power
330kW
Boiler Make
Hargassner
Installation type
Turn-key

A BBC World Service Transmitter station dating back to 1939 has been converted into high quality business premises, retaining many of the original features. The heat and hot water provision is provided by a single biomass boiler operating on wood pellet fuel. BBSM Ltd completed the design, specification and full turn-key installation.

Workshops and office complex

Location
Wales
Boiler power
1.2MW
Boiler Make
Binder
Installation type
Turn-key

A large busy coach repair workshops and office complex are provided with heat from a 1.2MW wood chip boiler. BBSM provided a turnkey solution for the project.

Kitchen manufacturer

Location
Northern England
Boiler power
4MW
Boiler Make
Polytechnik
Installation type
Contract

BBSM Ltd provided an engineering team to the developer to complete the installation and assembly of a 4.0MW biomass boiler system operating on wood residue from the company’s manufacturing process.

Seaweed drying plant

Location
Scotland
Boiler power
1.2MW
Boiler Make
Binder
Installation type
Turn-key

A second 1.2MW high-temperature hot water boiler was installed in the Scottish Islands to provide additional heating capacity for a large seaweed drying plant.